UNDERSTAND THE ARRANGEMENTS

More clarity.
Before you commit.

Use this guide to ask the right questions about your kit, its journey and assembly.

01 / THE KIT

Confirm what arrives.

Ask for a written component list: timber, wall boards, hardware, markings, instructions and any supplied foundation components. Confirm what you need to source separately.

02 / THE JOURNEY

Plan the handover.

Discuss collection or delivery, access, unloading, handling and storage. Availability and costs depend on the project location and agreed arrangements.

03 / THE BUILD

Agree who does what.

Ask about site preparation, foundations, assembly skills, tools and contractor help. Establish responsibilities before ordering.

Your pre-order conversation
TopicBring to the conversationConfirm with the team
BuildingLayout, intended use, approximate sizeApproved dimensions and specification
SiteZIP, photographs, access detailsSite and foundation requirements
SupplyPickup or delivery preferenceComponents, transport, unloading and lead time
AssemblyYour experience and help availableInstructions, tools and responsibilities
OrderQuestions and preferred timingWritten quote, payment and ordering terms
Discuss the arrangements ↗
THE DETAILS BEHIND THE DESIGN

The thinking
behind the details.

Metal below ground

The design keeps timber out of the ground, with metal components extending below ground. Ask the team to confirm the foundation components and requirements for your project.

Position before the pour

The framework is positioned, squared, levelled and plumbed before concrete is poured. Use the approved project instructions for the actual sequence and installation requirements.

Stacked wall boards

Stacked two-by-eight wall boards slide into grooves, with a pressure-treated bottom board. Final wall specifications and available options need confirmation.